secretary January 30, 2021 0

Indian Community Centre Updates

This web page is created to keep the community updated with the latest progress of Indian community Centre.

ICC Construction Work Progress: June 2021

  1. Aluminum frame for front full height glazing installed.
  2. Auditorium: 90% Ceiling works, 95% of walls complete,  95% HVAC completed
  3. Plumbing, Electrical wire pulling works 85% completed
  4. Ground floor: internal walls 85% complete, paint preparation works progressing, small window frames installation and tiling works of toilet block in progress
  5. First Floor Foyer: Studwork for timber cladding 85% complete, ceiling framework , Air condition ducting works and stud wall behind reception in progress (>80% completed)
  6. Construction / fabrication of Water tanks behind pump room on Concrete pad 85% complete
  7. Light pole foundation works ongoing in carpark areas.
  8. Retaining wall at rear boundary complete, backfilling and levelling works in progress

Pictures:

ICC Construction Work Progress: April – May 2021

  1. Aluminum frame installed for front full height glazing.
  2. Concrete pad behind pump room for water tanks installed
  3. Pump room roofing completed
  4. Stormwater drain pits installed around the main building
  5. Installing clips for wooden cladding at reception full height wall completed
  6. Roofing to entrance canopy completed
  7. Aluminum window frames are installed to kitchen and side Wall
  8. Stud walls at first floor for back and side walls of Auditorium almost complete
  9. Air condition ducting works at ground and first floor started
  10. HVAC, plumbing Electrical wire pulling works in progress
  11. Internal stud wall ongoing at Ground & first floor, also stud wall for Auditorium staging and store
  12. External painting in progress

Pictures:

ICC Construction Work Progress: March 2021

Pictures (4) Facebook

February, 2021

The construction of the ICC has been in progress.

Here are some latest photos of the ICC site:

January, 2021

The construction of the ICC has started in January 2021. On 14th January the Earthwork had started. At 6.30 am, the ISWA Management Committee, Consul General of India in Perth Madam Dantu Charandasi, a few life members and community members conducted a simple prayer before starting the journey.

https://www.facebook.com/IndianSocietyofWA/videos/3463860773741487

Here are some latest photos of the ICC site:

For more pictures click below:

https://www.facebook.com/media/set/?vanity=IndianSocietyofWA&set=a.3809457912449392

December, 2020

On 5th December 2020, Premier of WA Mark McGowan announced $1.5M for the Indian Community Centre Project. Details here.

An update to the community was issued on 6th December 2021. Please read it here.

For more photos of the event, please check the following Facebook link:

https://www.facebook.com/IndianSocietyofWA/posts/3345901892138332